Archive: July 2014

Dainichi Boulder Yamanashi Prefecture

A Climb up the Dainichi Boulder Aside from scaling the majestic peak of Mt. Mizugaki, another equally stunning viewpoint was delivered from the Dainichi Boulder 大日岩 on the first day. I previously passed by this rather massive rock conglomeration...

Mt. Mizugaki 瑞牆山

Hiked on Jul 31, 2014    Aug 23, 2023 . Mizugaki-sansou 瑞牆山荘 – Mt. Mizugaki 瑞牆山   Duration: 5.5 hours   Distance: 5.9 km   Elevation change: 720 metres   Highest point: 2230 metres   Start: Mizugaki-sansou  ...

Sesshoseki Murder Stone

Legend of the Sesshoseki Murder Stone On March 5, 2022, it was reported that the stone had split into two parts most likely a result of natural weathering. Our second day in Nasushiobara was spent around the Nasu Onsen hot spring resort situated...

Momijidani Suspension Bridge

Longest Suspension Bridge in Nasushiobara Located a 70 minute shinkansen ride from Tokyo the popular tourist spot of Nasushiobara is a picturesque region in Tochigi Prefecture. The city has two main hot spring towns namely Nasu Onsen and Shiobara...

Archives

Subscribe

Get the latest posts straight to your inbox. No spam, ever. Unsubscribe at any time.